Save the Date: Camas Ridge Grand Opening on Oct. 24
Please join us on Thursday, October 24, from 6-7:30 p.m., for the grand opening of Camas Ridge Elementary School’s new building, 1150 E. 29th Ave. There will be tours, refreshments and, of course, the ceremonial ribbon-cutting.
The new two-story, 74,000-square-foot school building opened to students this fall after two years of construction. It's a high-quality learning environment that is safe, welcoming and sustainable. PIVOT Architecture designed the building, and Chambers Construction served as the project's construction manager and general contractor. Camas Ridge is the last of the four major school construction projects funded by the bond measure that local voters approved in 2018. Thank you, 4J community!
Reserve la fecha: Gran inauguración de Camas Ridge el 24 de octubre
Por favor acompáñenos el jueves 24 de octubre, de 6 a 7:30 p. m., para la gran inauguración del nuevo edificio de la Escuela Primaria Camas Ridge en el 1150 E. 29th Ave. Habrá recorridos, refrigerios y, por supuesto, la ceremonia de inauguración.
El nuevo edificio escolar de dos pisos y 74,000 pies cuadrados abrió sus puertas a los estudiantes este otoño después de dos años de construcción. Es un entorno de aprendizaje de alta calidad que es seguro, acogedor y sostenible. Arquitectura PIVOTE diseñó el edificio y Chambers Construction actuó como director de construcción y contratista general del proyecto. Camas Ridge es el último de los cuatro principales proyectos de construcción de escuelas financiados por la medida de bonos que los votantes locales aprobaron en 2018. ¡Gracias, comunidad 4J!